{"id":4750,"date":"2025-09-24T08:15:43","date_gmt":"2025-09-24T05:15:43","guid":{"rendered":"https:\/\/pettersteel.fi\/?p=4750"},"modified":"2025-09-24T08:22:16","modified_gmt":"2025-09-24T05:22:16","slug":"pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset","status":"publish","type":"post","link":"https:\/\/pettersteel.fi\/en\/uutiset\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset","title":{"rendered":"PetterSteel Completed the Sheet Metal Works for DHL\u2019s New Logistics Centre"},"content":{"rendered":"<p>DHL Express\u2019s new logistics centre in the Vantaa Airport area was completed in July 2025, with Meijou Oy serving as the project's main contractor. The project was significant in scale. With a gross floor area of approximately 16,000 m\u00b2, the facility serves as DHL\u2019s main sorting centre in Finland.<\/p>\n<p><span style=\"font-weight: 400;\">PetterSteel was responsible for all sheet metal works for the building, from manufacturing through to installation. The scope of work included overhead doors, pedestrian doors, interior doors, fa\u00e7ades, and interior finishing details.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cOriginally, our work was limited to the flashing details around pedestrian and overhead doors, but the scope of the contract eventually expanded significantly. In total, we supplied and installed more than 3.2 kilometres of flashing profiles for the project, primarily for interior applications,\u201d says Jani Paukkeri, Site Manager at PetterSteel.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Some of the flashing profiles were delivered painted in DHL\u2019s corporate colours, providing the finishing touch to the building\u2019s appearance.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter wp-image-4752 size-full\" src=\"https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_02.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_02.jpg 1920w, https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_02-300x169.jpg 300w, https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_02-1024x576.jpg 1024w, https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_02-768x432.jpg 768w, https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_02-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h2><b>A Reliable Partner for a Major Project<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">In large construction projects, reliability and consistent adherence to schedules are essential. Equally important are proactive planning, the ability to respond quickly to site requirements, and the capability to manage the project from start to finish. Once again, these objectives were achieved through PetterSteel\u2019s systematic service model.<\/span><\/p>\n<p class=\"translation-block\">\u201cThe cooperation went very well. Communication was straightforward, and everything progressed as agreed. Scheduling and practical arrangements were handled flexibly, and the overall approach was professional, reliable, and well organized. The team responded quickly to the needs of the site. Overall, we were left with a very positive impression of both the project and the way it was carried out,\u201d says Erno Eloranta, Site Manager at Meijou Oy.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-4753\" src=\"https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_03.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_03.jpg 1920w, https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_03-300x169.jpg 300w, https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_03-1024x576.jpg 1024w, https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_03-768x432.jpg 768w, https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_03-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h2><b>A Major Construction Project Built to Modern Standards<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">DHL is one of the world\u2019s largest logistics and courier companies. Operating in more than 220 countries and territories, it has the most extensive logistics networks in the world.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It is therefore no surprise that the new logistics centre was designed and built in accordance with modern sustainability principles. The facility has achieved an Energy Class A rating and is targeting LEED Platinum certification as well as a BREEAM Excellent rating. The building includes more than 10 kilometres of geothermal wells and approximately 3,000 square metres of solar panels, among other energy-efficient solutions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Developed by the main contractor Meijou Oy, the logistics centre employs approximately 150 people and occupies a strategically important location in the immediate vicinity of Helsinki Airport.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u00a0\u201cMeijou was a new partner for us in installations in the Helsinki metropolitan area, and it was great to work with them on this project. The cooperation was smooth throughout, and the project left us with a very positive impression. We would like to thank the entire Meijou team, and hopefully we will have the opportunity to work together again soon,\u201d Paukkeri concludes.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>Photos: Meijou Oy<\/p>","protected":false},"excerpt":{"rendered":"<p>Vantaan lentoaseman alueelle valmistui hein\u00e4kuussa 2025 DHL Expressin uusi logistiikkakeskus, jonka p\u00e4\u00e4urakoitsijana toimi Meijou Oy. Hanke oli mittakaavaltaan merkitt\u00e4v\u00e4. Rakennusalaltaan noin 16 000 brm\u00b2 rakennus toimii DHL:n Suomen p\u00e4\u00e4lajittelukeskuksena. PetterSteel vastasi rakennuksen pellityksist\u00e4 kokonaisuudessaan, tuotannosta aina asennuksiin asti. Ty\u00f6 kattoi nosto- ja k\u00e4yntiovet, sis\u00e4ovet, julkisivut sek\u00e4 sis\u00e4puolen viimeistelyt. \u2013 Alun perin ty\u00f6mme k\u00e4sitti vain k\u00e4ynti- [&hellip;]<\/p>\n","protected":false},"author":13,"featured_media":4751,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,5],"tags":[],"class_list":["post-4750","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized-fi","category-uutiset"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>PetterSteel toteutti DHL:n uuden logistiikkakeskuksen rakennuspellitykset - PetterSteel<\/title>\n<meta name=\"description\" content=\"PetterSteel vastasi DHL Expressin uuden logistiikkakeskuksen rakennuspellityksist\u00e4 tuotannosta asennukseen asti.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pettersteel.fi\/en\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PetterSteel toteutti DHL:n uuden logistiikkakeskuksen rakennuspellitykset - PetterSteel\" \/>\n<meta property=\"og:description\" content=\"PetterSteel vastasi DHL Expressin uuden logistiikkakeskuksen rakennuspellityksist\u00e4 tuotannosta asennukseen asti.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pettersteel.fi\/en\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset\/\" \/>\n<meta property=\"og:site_name\" content=\"PetterSteel\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-24T05:15:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-24T05:22:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_01.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Joakim Heimonen\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Joakim Heimonen\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/uncategorized-fi\\\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/uncategorized-fi\\\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset\"},\"author\":{\"name\":\"Joakim Heimonen\",\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/#\\\/schema\\\/person\\\/f7f075de3a73a283880c69c9a2e9aafc\"},\"headline\":\"PetterSteel toteutti DHL:n uuden logistiikkakeskuksen rakennuspellitykset\",\"datePublished\":\"2025-09-24T05:15:43+00:00\",\"dateModified\":\"2025-09-24T05:22:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/uncategorized-fi\\\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset\"},\"wordCount\":368,\"publisher\":{\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/uncategorized-fi\\\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pettersteel.fi\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/pettersteel_hankenosto_dhl_01.jpg\",\"articleSection\":[\"Uncategorized @fi\",\"Uutiset\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/uncategorized-fi\\\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset\",\"url\":\"https:\\\/\\\/pettersteel.fi\\\/uncategorized-fi\\\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset\",\"name\":\"PetterSteel toteutti DHL:n uuden logistiikkakeskuksen rakennuspellitykset - PetterSteel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/uncategorized-fi\\\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/uncategorized-fi\\\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pettersteel.fi\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/pettersteel_hankenosto_dhl_01.jpg\",\"datePublished\":\"2025-09-24T05:15:43+00:00\",\"dateModified\":\"2025-09-24T05:22:16+00:00\",\"description\":\"PetterSteel vastasi DHL Expressin uuden logistiikkakeskuksen rakennuspellityksist\u00e4 tuotannosta asennukseen asti.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/uncategorized-fi\\\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/pettersteel.fi\\\/uncategorized-fi\\\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/uncategorized-fi\\\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#primaryimage\",\"url\":\"https:\\\/\\\/pettersteel.fi\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/pettersteel_hankenosto_dhl_01.jpg\",\"contentUrl\":\"https:\\\/\\\/pettersteel.fi\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/pettersteel_hankenosto_dhl_01.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"PetterSteel toteutti DHL:n uuden logistiikkakeskuksen rakennuspellitykset: ulkokuva\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/uncategorized-fi\\\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Etusivu\",\"item\":\"https:\\\/\\\/pettersteel.fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PetterSteel toteutti DHL:n uuden logistiikkakeskuksen rakennuspellitykset\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/#website\",\"url\":\"https:\\\/\\\/pettersteel.fi\\\/\",\"name\":\"PetterSteel\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/pettersteel.fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/#organization\",\"name\":\"Pettersteel\",\"url\":\"https:\\\/\\\/pettersteel.fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/pettersteel.fi\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/pettersteel.fi\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/logo.png\",\"width\":231,\"height\":65,\"caption\":\"Pettersteel\"},\"image\":{\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/pettersteel.fi\\\/#\\\/schema\\\/person\\\/f7f075de3a73a283880c69c9a2e9aafc\",\"name\":\"Joakim Heimonen\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PetterSteel Completed the Sheet Metal Works for DHL\u2019s New Logistics Centre - PetterSteel","description":"PetterSteel was responsible for the building's flashings for DHL Express's new logistics center, from production to installation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pettersteel.fi\/en\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset\/","og_locale":"en_GB","og_type":"article","og_title":"PetterSteel toteutti DHL:n uuden logistiikkakeskuksen rakennuspellitykset - PetterSteel","og_description":"PetterSteel vastasi DHL Expressin uuden logistiikkakeskuksen rakennuspellityksist\u00e4 tuotannosta asennukseen asti.","og_url":"https:\/\/pettersteel.fi\/en\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset\/","og_site_name":"PetterSteel","article_published_time":"2025-09-24T05:15:43+00:00","article_modified_time":"2025-09-24T05:22:16+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_01.jpg","type":"image\/jpeg"}],"author":"Joakim Heimonen","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Joakim Heimonen","Estimated reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pettersteel.fi\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#article","isPartOf":{"@id":"https:\/\/pettersteel.fi\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset"},"author":{"name":"Joakim Heimonen","@id":"https:\/\/pettersteel.fi\/#\/schema\/person\/f7f075de3a73a283880c69c9a2e9aafc"},"headline":"PetterSteel toteutti DHL:n uuden logistiikkakeskuksen rakennuspellitykset","datePublished":"2025-09-24T05:15:43+00:00","dateModified":"2025-09-24T05:22:16+00:00","mainEntityOfPage":{"@id":"https:\/\/pettersteel.fi\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset"},"wordCount":368,"publisher":{"@id":"https:\/\/pettersteel.fi\/#organization"},"image":{"@id":"https:\/\/pettersteel.fi\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#primaryimage"},"thumbnailUrl":"https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_01.jpg","articleSection":["Uncategorized @fi","Uutiset"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/pettersteel.fi\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset","url":"https:\/\/pettersteel.fi\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset","name":"PetterSteel Completed the Sheet Metal Works for DHL\u2019s New Logistics Centre - PetterSteel","isPartOf":{"@id":"https:\/\/pettersteel.fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pettersteel.fi\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#primaryimage"},"image":{"@id":"https:\/\/pettersteel.fi\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#primaryimage"},"thumbnailUrl":"https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_01.jpg","datePublished":"2025-09-24T05:15:43+00:00","dateModified":"2025-09-24T05:22:16+00:00","description":"PetterSteel was responsible for the building's flashings for DHL Express's new logistics center, from production to installation.","breadcrumb":{"@id":"https:\/\/pettersteel.fi\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pettersteel.fi\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/pettersteel.fi\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#primaryimage","url":"https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_01.jpg","contentUrl":"https:\/\/pettersteel.fi\/wp-content\/uploads\/2025\/09\/pettersteel_hankenosto_dhl_01.jpg","width":1920,"height":1080,"caption":"PetterSteel toteutti DHL:n uuden logistiikkakeskuksen rakennuspellitykset: ulkokuva"},{"@type":"BreadcrumbList","@id":"https:\/\/pettersteel.fi\/uncategorized-fi\/pettersteel-toteutti-dhln-uuden-logistiikkakeskuksen-rakennuspellitykset#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Etusivu","item":"https:\/\/pettersteel.fi\/"},{"@type":"ListItem","position":2,"name":"PetterSteel toteutti DHL:n uuden logistiikkakeskuksen rakennuspellitykset"}]},{"@type":"WebSite","@id":"https:\/\/pettersteel.fi\/#website","url":"https:\/\/pettersteel.fi\/","name":"PetterSteel","description":"","publisher":{"@id":"https:\/\/pettersteel.fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pettersteel.fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/pettersteel.fi\/#organization","name":"Pettersteel","url":"https:\/\/pettersteel.fi\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/pettersteel.fi\/#\/schema\/logo\/image\/","url":"https:\/\/pettersteel.fi\/wp-content\/uploads\/2021\/03\/logo.png","contentUrl":"https:\/\/pettersteel.fi\/wp-content\/uploads\/2021\/03\/logo.png","width":231,"height":65,"caption":"Pettersteel"},"image":{"@id":"https:\/\/pettersteel.fi\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/pettersteel.fi\/#\/schema\/person\/f7f075de3a73a283880c69c9a2e9aafc","name":"Joakim Heimonen"}]}},"_links":{"self":[{"href":"https:\/\/pettersteel.fi\/en\/wp-json\/wp\/v2\/posts\/4750","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pettersteel.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pettersteel.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pettersteel.fi\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/pettersteel.fi\/en\/wp-json\/wp\/v2\/comments?post=4750"}],"version-history":[{"count":12,"href":"https:\/\/pettersteel.fi\/en\/wp-json\/wp\/v2\/posts\/4750\/revisions"}],"predecessor-version":[{"id":4771,"href":"https:\/\/pettersteel.fi\/en\/wp-json\/wp\/v2\/posts\/4750\/revisions\/4771"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pettersteel.fi\/en\/wp-json\/wp\/v2\/media\/4751"}],"wp:attachment":[{"href":"https:\/\/pettersteel.fi\/en\/wp-json\/wp\/v2\/media?parent=4750"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pettersteel.fi\/en\/wp-json\/wp\/v2\/categories?post=4750"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pettersteel.fi\/en\/wp-json\/wp\/v2\/tags?post=4750"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}